July Pictures

Electrical

July 3

 

July 13

Fireplaces and Wood Stove

Front Gable Window In

 

 

July 18

Front Windows and Water

Laying 300 ft of PVC on a 90 plus degree day

But water at the house

 

July 19

Communications Panel and Master Bath Tub

Front Windows from Inside

 

 

July 20-21

Sprayed in Cellulose Insulation - Exterior walls and ceilings

 

 

Fiberglass Sound Control on interior walls

Fill Dirt for Around House

It's Nice to be able to put stuff in the garage.

At Least Partway!  See Rob, It works!

 

Sheet Rock is here

July 23

Brick Arrive

 

 

 

July 27

Green Metal Roof goes on front porch

July 29

Mortar & Sand